VAT reverse charge
Contents |
[edit] Introduction
Value Added Tax (VAT) is a tax added to the cost of certain goods and services. It is only accountable where the party raising an invoice is VAT-registered. Parties must register if their VAT-able turnover exceeds a minimum threshold.
In June 2018, the government launched a consultation on the introduction of a VAT reverse charge for construction services to tackle fraud in the construction industry. This was originally intended to come into effect on 1 October 2019, however following lobbying it did not actually come into effect until 1 March 2021
The reverse charge enables a customer to charge themselves VAT rather than the supplier charging it. This removes any opportunity for the supplier not to pay HMRC (missing trader fraud).
The reverse charge applies to businesses that supply services to another business that will then sell on that service, but not those that supply services to consumers.
Sometimes referred to as the domestic reverse charge, it applies only to supplies of specified construction services which are subject to the standard and reduced rate of VAT, which include:
- Construction, alteration, repair, extension, demolition or dismantling of buildings, structures, non-permanent structures, offshore installations, works forming part of land (i.e. walls, runways, docks, railways, pipelines, etc.).
- Installation of systems such as heating, lighting, air-conditioning, ventilation, drainage, and so on.
- Internal cleaning of buildings and structures.
- Painting and decorating.
- Services which are an integral part of preparing or completing those above (e.g. site clearance, excavation, scaffolding erection, landscaping, and so on).
Services and supplies that are excluded from the reverse charge include:
- Drilling and extraction of oil, natural gas, and minerals.
- Tunnelling and boring for underground works.
- Manufacture of building or engineering components and machinery.
- Signage and advertisements.
- Installation of seating, blinds, shutters, etc.
- Installation of security systems and alarms.
More information about the reverse charge can be found at: https://www.gov.uk/guidance/vat-reverse-charge-technical-guide
[edit] Criticism and delay
In July 2019, the Federation of Master Builders called for a six-month delay following research that found more than two thirds of construction SMEs had not even heard of the reverse charge.
In September 2019, following strong lobbying by the construction industry the government announced that the reverse charge would not be introduced until 1 October 2020, stating:
Industry representatives have raised concerns that some businesses in the construction sector are not ready to implement the VAT domestic reverse charge for building and construction on 1 October 2019. To help these businesses and give them more time to prepare, the introduction of the reverse charge has been delayed for a period of 12 months until 1 October 2020. This will also avoid the changes coinciding with Brexit. |
In June 2020 the Government delayed the introduction of reverse charge VAT by a further five months until 1 March 2021 due to the Coronavirus pandemic. Despite continued lobbying to push back this date further, the reverse charge was introduced on 1 March 2021.
Andy Mitchell, chairman of the Construction Leadership Council said: “The implementation of Reverse charge VAT will restrict cashflow in our industry, especially to the smallest firms, at an extremely critical financial period for many businesses. This policy risks reversing any recovery industry has made from Covid-19 and will limit the scope for protecting and creating jobs across the UK.”
[edit] Implementation
In Novermber 2021, subcontractors complained that they were waiting too long to to receive VAT repayments. An HMRC spokesperson said: “HMRC aim to make VAT repayments within 30 calendar days of receiving a return. In most cases claims are paid within five working days of receipt of the return. However, if we select it for verification checks, this could take 30 days or longer, dependent upon how long it takes the customer to provide the information requested to verify the return.”
[edit] Related articles on Designing Buildings
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.